Judges

Reading a quote

A good quote names the deliverable, its rough length, the register, the turnaround and the number, so both sides can see the same job.

By 4 min readJudges

Guides on Judges: Boundaries belong to the judge, The case against the price list, What the skill in judging actually is

A proper quote names the deliverable, a length range, the register, a turnaround window and any revision terms, then puts a price on that job. A number on its own is not a quote: when the description is thin, the price is the only thing either side can hold onto once the clip arrives.

The deliverable, named plainly

A quote should say what form the review takes: a short video, a written piece, audio, occasionally a live session. This sounds obvious until it is skipped, and it is skipped more often than buyers expect, because a judge who works mostly in one form assumes the buyer knows without being told. The form changes the job in ways worth knowing before you ask - a written review and a two-minute clip are not interchangeable products wearing the same price tag.

Length, given as a range

Length is the single factor that moves a quote most, so a quote that is silent on it has left out the part doing most of the work behind the number. A precise figure is rarely useful either - "about a minute" or "a few minutes" tells a buyer what to expect without pretending a judge can promise a stopwatch reading before recording. What matters is that the range is stated, not guessed at from the price alone.

The register, spelled out

Worship, honest, playful, SPH, a scenario with setup - the quote should confirm which one the judge understood the brief to be asking for, in their own words rather than just repeating the buyer's label back. This is the cheapest possible check against a mismatch: if the register named in the quote does not match what the buyer meant, that is the moment to say so, before the judge has recorded anything.

Turnaround, as a window

When the clip will actually arrive matters as much as what it will contain, and a quote that names a window - a couple of days, by the weekend - sets an expectation both sides can be held to. Without it, what to expect around turnaround becomes a guessing game for the buyer and a source of unnecessary chasing messages for the judge.

Revision terms, if there are any

Not every judge offers revisions, and that is a legitimate position, but a quote should say so either way rather than leaving it to be discovered after delivery. A revision exists to fix a clip that missed the brief, not to accommodate a buyer changing their mind, and a quote that states this up front heads off a conversation nobody wants to have later.

The number itself

Everything above exists to make the number legible rather than arbitrary. A price with no context reads as a figure pulled from nowhere; the same price attached to a stated length, register and turnaround reads as a judgement a buyer can actually evaluate and, if the scope changes, renegotiate against something concrete. The number should also be the whole number. UK consumer law now says as much for any trader: the CMA's 2025 price transparency guidance says a total price "should normally include any unavoidable or 'mandatory' charges", and that hiding them until later in the purchase is illegal drip pricing.

Why a bare number is the weaker version

A judge who quotes only a figure has not done anything dishonest, but they have made their own life harder: a dispute later has nothing written to point back to, and the entire case for quoting instead of posting a fixed menu rests on the quote actually describing the job, not just pricing it. This is also where the contrast with the automated side of the market is sharpest. A scoring tool's price sits on the card before you upload because the output never varies, and there is nothing to describe beyond the price itself - no register, no length, no turnaround, because the computation behind it is fixed and identical for every submission. Human pricing works the opposite way: the model reads an image the same way every time, and a quote from a person is instead responding to a specific brief, which is exactly why it needs the description a fixed price does not. A measurement service occupies a middle ground worth naming once - the method itself is standardised, so what varies there is not the job but the number the technique returns.

A full quote costs a judge one extra sentence or two beyond the price, and it is worth asking for if one arrives thin. Rate Cock structures its quote flow around these fields rather than a free-text number for exactly this reason - a quote that names the job is a quote both sides can actually agree to, and one that does not is a number waiting to be argued about. Writing a brief that gets a quote like this back in the first place is mostly about being specific yourself, which is the same lever that tends to bring the number down.

Read next

Full archive